1 |
|
Description: technical supervision of the construction of the facility : «Administrative building with parking area LLP DCS» located at the territory of old Airport in Atyrau |
Client:
«ABE&K» LLP
|
2 |
|
Description: technical supervision of the construction of the facility: «Production base of LLP ABE&K». |
Client:
«ABE&K» LLP
|
3 |
|
Description: Designing, obtaining of approvals, technical supervision and designer supervision over the facility «Helicopter refueling station «KE-F», located on «Island-А» |
Client:
«Caspian Radio Services LLP
|
4 |
|
Description: Preparation of as-built documentation for commissioning, designer supervision and technical supervision of OPF facility in compliance with RoK standards. |
Client: Agip KCO
|
5 |
|
Description: Preparation of as-built documentation for commissioning, designer supervision and technical supervision of the facility «Kashagan field development experimental program project». Offshore Complex, in compliance with RoK standards. |
Client: Agip KCO
|
6 |
|
Description: Technical support of mobile buildings installation at the river port of Atyrau |
Client: Agip KCO
|
7 |
|
Description: Designer supervision over the construction of OPF unit, tranch 1, 2 and 3 |
Client: Agip KCO
|
8 |
|
Description: Technical support of construction of Bautino base facilities. |
Client: Agip KCO
|
9 |
|
Description: Designer supervision over construction of gas-turbine and steam power generation units. Expansion. Phase 3. |
Client: Agip KCO
|
10 |
|
Description: Technical support of construction of liquid process waste storage area. |
Client: Agip KCO
|
11 |
|
Description: Designer supervision of the facility “Temporary facilities’ ACV Hangar toward east of KP 72-345,OPF, Atyrau oblast” |
Client: Agip KCO
|
12 |
|
Description: Engineering services during construction of green shelter belt within the sanitary protection area of OPF.
Green shelter belt is constructed between Samal and Bolashak plant. |
Client: Agip KCO
|
13 |
|
Description: Designing, approval of the design with state authorities and holding of designer supervision.
Location of work: Bautino base. |
Client: «Fort Shevchenko Subsidiary Company» LLP
|
14 |
|
Description: Cooperation with construction contractors of Agip KCO, work with the representatives of state authorities during technical, acceptance, state acceptance committees for OPF. |
Client: Agip KCO
|
15 |
|
Description: Engineering services under construction of facilities of Consolidated Contracting Engineering and Procurement S.a.L. – Offshore located at OPF territory of Makat, Atyrau oblast. |
Client: Consolidated Contracting Engineering and Procurement S.a.L. – Offshore
|
16 |
|
Description: Technical support of: early works on fuel gas pipeline. Phase2
Construction of export gas pipeline |
Client: LLP «Punj Lloyd Kazakhstan»
|
17 |
|
Description: Engineering services during construction of offsite area facilities within the territory of OPF plant in accordance with codes and regulations of RoK. |
Client:
Kazakhstan Branch of «Gate Insaat Taahhut ve Sanayi Ticaret»
|
18 |
|
Description: Detail design development for pre-construction activities (embankment of 4m in height for base compaction), for the following design and construction of the facility «Extension of the port terminal for 260m». Collection of initial data for preparation of EIA section. Adjustment of the design Bautino and Koshanai bases. |
Client: Agip KCO
|
19 |
|
Description: Engineering services during construction of Koshanai facilities, project documentation preparation, approvals. |
Client: Agip KCO |
20 |
|
Description: Technical documentation development and obtaining of approvals from state authorities “Drill cutting injection on ЕРС-3 Island». Engineering services. |
Client: Agip KCO
|